Updated!
Total TPE: 476
Applied TPE: 476
Banked TPE: 0
@slumped64 Heyo, slumped!
1. Firstly, you have 20 TPE to spend (prev bank [15] + new earnings [5] = 20)
2. Secondly, in the 70s range, each increase costs 5, so I've increased your Pass Blocking to 72 (10 spent) and your Run Blocking to 72 (10 spent), spending a total of 20. This leaves you with 0 in the bank.
Total TPE: 476
Applied TPE: 476
Banked TPE: 0
@slumped64 Heyo, slumped!
1. Firstly, you have 20 TPE to spend (prev bank [15] + new earnings [5] = 20)
2. Secondly, in the 70s range, each increase costs 5, so I've increased your Pass Blocking to 72 (10 spent) and your Run Blocking to 72 (10 spent), spending a total of 20. This leaves you with 0 in the bank.