05-02-2022, 08:48 AM
(This post was last modified: 05-05-2022, 02:50 PM by unconfident. Edited 1 time in total.)
1M Weekly Training
+
T4 Equipment (8.5M)
=
9.5
PROCESSED
+
T4 Equipment (8.5M)
=
9.5
PROCESSED
05-02-2022, 08:48 AM
(This post was last modified: 05-05-2022, 02:50 PM by unconfident. Edited 1 time in total.)
1M Weekly Training
+ T4 Equipment (8.5M) = 9.5 PROCESSED |
|