1. Please use the direct link for each post. your last 6 links were the exact same for the thread link, but not for any specific post. I was able to find the correct posts this time, but next time I will not look for them if they are done incorrectly and they will not be added to your total.
2. The mock draft is the number shown next to your name PLUS 4 more TPE. I have added that to your TPE totals.
3. going from 73 to 77 costs 20 TPE. Because of the missed TPE from the mock draft and your miscalculation of your used TPE (you used 22 when you showed 24), I was able to keep the 77 value. You now have 1 TPE banked for your next update.
UPDATED.
113 Total TPE
1 Banked TPE
2. The mock draft is the number shown next to your name PLUS 4 more TPE. I have added that to your TPE totals.
3. going from 73 to 77 costs 20 TPE. Because of the missed TPE from the mock draft and your miscalculation of your used TPE (you used 22 when you showed 24), I was able to keep the 77 value. You now have 1 TPE banked for your next update.
UPDATED.
113 Total TPE
1 Banked TPE